corporate executive hand on laptop, laptop lying on a table with some corporate docs and camera point of view is on top

New Format Questions in CAPM Exam | CAPM Practice Tests

The CAPM (Certified Associate in Project Management) Exam has changed in July-2023 and PMI (Project Management Institute) has introduced new format for the CAPM exam and also, they have introduced new format questions in the Exam.

Project Management July 24, 2024

PMI has introduced new format for CAPM Certification Exam in 2023. There has been change in the CAPM Exam format, CAPM Exam syllabus and CAPM Exam Question Types. The new CAPM Question Types are of some different format than Multiple choice and Multiselect questions. The CAPM Aspirants must be familiar with these new CAPM Question types to successfully clear the CAPM Exam without any hassle. In this article, you will get detailed information about the CAPM New format questions and you will get numerous free CAPM sample questions to understand how the new format questions look, how to attempt them in the CAPM Exam.

The new CAPM Certification Exam follows the below mentioned format:

Sr No. Domain Percentage of questions
1 Project Management Fundamentals and core concepts 36%
2 Predictive, Plan-Based Methodologies 17%
3 Agile Frameworks / Methodologies 20%
4 Business Analysis Frameworks 27%
  Total 100%

As per the latest format of CAPM Exam format, the below mentioned new format questions or new question types are introduced in the CAPM exam. Apart from Multiple choice and Multi-Select Questions, some new format questions are expected in the CAPM Exam. All these types of questions are covered comprehensively in CAPM Bootcamp at CertifyEra.

New Question Types in CAPM:

The following are the new question format types expected in CAPM exam:

Point and Click (Hot Spot/Hot Area):

In these types of questions, the candidates will be given a project scenario and an image. Based on what the scenario says, the candidate will be asked to click on a specific area on the image as an answer to the given question. This image can be a graph, chart, diagram etc. For hot spot, the area chosen by the candidate will be marked with an X. For a hot area, as the candidate moves their mouse over the image, the specific area of the image will be highlighted upon clicking on the area.

Enhanced Matching (Drag-n-drop):

For most enhanced matching (drag and drop) items, candidates will see two columns of boxes. They will be given a scenario and will need to match the boxes on the left with the boxes on the right (opposite for Arabic candidates). The candidates will need to drag the items from right on to the empty boxes to match them with the items given on left.

Animation video:

For animation video items, candidates will watch the animation video. Candidates can watch the animation multiple times and use the video controls to start, stop, rewind, etc. Based on the scenario, the candidate will be presented with a multiple-choice question to answer. Candidates will receive headphones at the testing centre. The animations will have audio and will also include closed captioning. 

Comic Strip:

For comic strip items, the candidate will read the comic strip. The candidate may need to scroll down to see the complete comic strip. Based on the scenario in the comic strip, the candidate will be presented with a multiple-choice question to answer.

There will be one question to be answered for each animation or comic strip that is viewed. Candidates that take the CAPM via online proctored testing (OPT) will only view comic strip questions to ensure there are no sound issues.

Free CAPM Sample Questions:

Free CAPM Sample Question No.1:

Question Type: Comic Strip

Refer the comic strip below and fill in the blank:

Panel 1:

Project Manager: I am monitoring the project and I am able to see many communication glitches, cost overruns and schedule delays in the project

Panel 2:

Steering committee: You should use ________________ document for tracking and managing these all things.

  1. Risk register
  2. Issue log
  3. Change log
  4. Assumptions log

Answer: B

Explanation: The problems stated in the question are ongoing issues in project. The project manager should use Issue log for tracking and managing those problems. This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

To get access to numerous CAPM practice questions and answers, follow the below link and get the latest CAPM exam questions and answers crafted as per the latest CAPM exam format and syllabus.

Free CAPM Sample Question No.2:

Question Type: Multi-select

The agile project team is executing the work as part of their fourth sprint. The cost of work planned for the sprint is $4000. They are half-way through the sprint and completed the work whose value is $1500. Till now, the team has consumed $ 2200 already. What is status of the sprint? Choose two.

  1. Behind the schedule
  2. Ahead of schedule
  3. Over budget
  4. Under budget

Answer: A and C

Explanation: EV (Earned Value ) = The value of work completed = $1500

PV (Planned Value) = The cost of work planned

For whole sprint, PV = $4000

Since, they are half-way through the sprint PV = $2000

Actual Cost (AC) consumed till now = $2200

For determining the status, we can use,

Schedule Variance (SV) =  EV- PV = 1500 - 2000 = -500, since schedule variance is negative, the project is behind the schedule

Cost Variance (CV) = EV - AC = 1500 - 2200 = -700, since cost variance is negative, the project is over cost.

Project Performance Domain - Measurement

Free CAPM Sample Question No.3:

Question Type: Comic Strip

Refer the comic strip and identify the project phase:

Panel 1:

Project Sponsor: Are we going good ? Do we need any support from any of the organizational teams

Panel 2:

Project Manager: I am in the process of baselining the scope now. Would let you know if any help needed.

  1. They are in project initiation phase
  2. They are in Project Planning phase
  3. They are in Project Execution phase
  4. They are in Project closure phase

Answer : B

Explaination: The project manager is baselining the scope which is a task in planning phase. Project Performance Domain - Planning. This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

Free CAPM Sample Question No.4:

Question Type: Enhanced Matching (Drag-n-drop)

Match the below given team development stage with its characteristics:

  1. A - 4; C - 3 ; B - 1; D -2
  2. A - 3; C - 4 ; B - 1; D -2
  3. A - 2; C - 4 ; B - 1; D -3
  4. A - 1; C - 4 ; B - 3; D -2

Answer : B

Explanation: Project Performance Domain – Team. These questions will appear in drag and drop form (Enhanced matching form) in exam. You need to drag the blue items on to the green empty boxes to match them with yellow items. The right match is:

 

 

 

 

 

To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a Drag-n-drop or Enhanced matching question in which you need to drag the items from right to match them with the items given on left. In CAPM Exam portal, you will be able to drag the items. To explore more such CAPM sample questions, access CAPM Practice Tests. 

 

Free CAPM Sample Question No.5:

Question Type: Multiple choice

Which of the following statements is false with respect of adoption of Agile methodology?

  1. Adoption of Agile is not limited to certain size organization
  2. The Agile mindset applies universally
  3. Only large organizations should consider adopting Agile
  4. Agile can be implemented by learning, experimenting, giving feedback, experimenting again

Answer: C

Explanation: Agile can be adopted by any organization willing to transform and improve their ways of working. Project Performance Domain – Development approach and project life cycle. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

Free CAPM Sample Question No.6:

Question Type: Multiple choice

Business Analysis work plan needs to be created in a project to identify the tasks that need to be carried out in business processes during the project life cycle. Who normally creates this plan?

  1. Business Analyst
  2. Project Manager
  3. Both Business Analyst and Project Manager
  4. The team members

Answer : C

Explanation: Business Analysis Work plan needs to be created by Business Analyst in collaboration with Project Manager as ultimately the Business Analysis Work plan will be integrated within the project management plan. Project Performance Domain – Planning.To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

Free CAPM Sample Question No.7:

Question Type: Comic Strip

Read the following comic strip and answer the following:

Person 1: I am trying to define the project scope by considering all possible elements

Person 2: As soon as, I finish defining the product scope, I will share my document with you

Person 1: Could you please share the traceability matrix with me?

  1. Person 1 - Project Manager
  2. Person - 2 - Business analyst
  3. Person -1 Business Analyst
  4. Person 2 - Project Manager

Answer: A and B

Explanation: Such questions are expected in exam in the comic strip form wherein you need to read the complete conversation between them and answer the question. Project Manager manages the project scope while the Business Analyst manages the product scope and create the product scope documents including traceability matrix. Project Performance Domain – Planning. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests.

Free CAPM Sample Question No.8:

Question Type: Hot-Spot

Click the area indicates that Chaotic Project.


1.      Region A

2.      Region D

3.      Region C

4.      Region B

Answer: 2 i.e. Region D

Explanation: The actual graph looks like the one given below. So, region D represents the Chaos and chaotic projects fall this region. In CAPM exam, the graph will be given with various regions indicated on it and you have to click a specific region to mark your answer for the question.


To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a hot-spot kind of question in which you need to read the graph and answer the question by clicking a particular region on the graph. To get access to many such hot spot/ hot area sample questions of CAPM exam, you may explore the CAPM Practice Tests.

Free CAPM Sample Question No.9:

Question Type: Multiple choice

The Business Analyst team has performed feasibility study and you as a project manager trying to buy-in from all important stakeholders. One of the stakeholders wants to see tangible and intangible benefits that the project will provide. Which document should you share?

  1. Business Case
  2. Project Charter
  3. Project Management Plan
  4. Ask sponsor to deal with him

Answer: A          

Explanation: Business Case consists of the business need, proposed solution, tangible, intangible costs and benefits of the proposed solution. Project Charter consists of high-level information about project and is created in project initiation. Project Management Plan would consist of details about how the project will be carried out and it would be created after the project charter is approved. Asking sponsor to deal with it is not appropriate from project management responsibility perspective. Project Performance Domain – Planning. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

Free CAPM Sample Question No.10:

Question Type: Enhanced Matching (Drag-n-drop)

Match the below given Models with the related terms:

A) McClelland theory  i) Hygiene and Motivating agents

B) Daniel Pink theory  ii) Safety Social esteem needs

C) Herzberg theory     iii) Autonomy Mastery Purpose

D) Maslows theory      iv) Achievement Power Affiliation

  1. A - iv; B - iii; C- i; D - ii
  2. A - ii; B - iii; C- i; D - iv
  3. A - iv; B - iii; C- ii; D - i
  4. A - i; B - iii; C- iv; D - ii

Answer: A

Explanation: Such questions are expected in the Enhanced Matching (Drag-n-drop) form in exam. You need to drag the items from the right to match with the items on left.

The right match here is: A) McClelland theory iv) Achievement Power Affiliation

B) Daniel Pink theory iii) Autonomy Mastery Purpose

C) Herzberg theory i) Hygiene and Motivating agents

D) Maslow's theory ii) Safety Social esteem needs

Project Performance Domain – Team.

To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a Drag-n-drop or Enhanced matching question in which you need to drag the items from right to match them with the items given on left. In CAPM Exam portal, you will be able to drag the items. To explore more such CAPM sample questions, access CAPM Practice Tests

Free CAPM Sample Question No.11:

Question Type: Comic Strip

Panel 1:

  • Project Manager: "We need to decide on the development approach for our new project. Should we go with Agile or Waterfall?"

Panel 2:

  • Team Member 1: "Agile would be great for flexibility and adapting to changes. We can iterate based on feedback."

Panel 3:

  • Team Member 2: "But Waterfall might be better if we have clear requirements from the start and a fixed scope."

Panel 4:

  • Stakeholder: "I’m concerned about the timeline and budget. Which approach will help us manage these better?"

Panel 5:

  • Project Manager: "Agile offers more flexibility but might require more frequent adjustments. Waterfall provides a structured approach but can be less adaptable to changes."

Panel 6:

  • Stakeholder: "Given that we have a fixed deadline and well-defined requirements, maybe Waterfall is the safer bet for us."

Based on the comic strip, which development approach is recommended for the project?

  1. Agile
  2. Waterfall
  3. Hybrid
  4. Scrum

Answer: B

Explanation: Option A (Agile) is noted for its flexibility and adaptability, which is not ideal given the fixed timeline and well-defined requirements. Option B (Waterfall) is recommended because it provides a structured approach and is suited for projects with clear requirements and fixed deadlines. Option C (Hybrid approach) is not explicitly discussed in the comic strip. Option D (Scrum) is a specific Agile methodology, which may not be the best fit given the emphasis on fixed requirements and timeline. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests.

Free CAPM Sample Question No. 12:

Question Type: Comic Strip

Panel 1:

  • Project Manager: "Alright team, we need to create a document for defining the procedures to manage the changes to the project documents."

Panel 2:

  • Developer 1: "Yes, we are on it and we should be able to share it immediately"

Based on the conversation, which document should the team share with the Project manager?

  1. Configuration Management Plan
  2. Scope Management Plan
  3. Quality Management Plan
  4. Project Charter

Answer: A

Explanation: Configuration Management Plan outlines the process for managing changes to project documents and deliverables, ensuring that all changes are systematically controlled and tracked. The purpose of the Scope Management Plan is to define and document how the project scope will be managed throughout the project lifecycle. The Quality Management Plan outlines how quality will be managed and assured throughout a project. It defines the quality policies, objectives, and responsibilities necessary to ensure that the project's deliverables meet the required standards and stakeholder expectations. The Project Charter is a critical document in project management that formally authorizes the existence of a project and provides a high-level overview of its objectives, scope, and stakeholders. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests.

Free CAPM Sample Question No. 13:

Question Type: Comic Strip

Panel 1:

  • Project Manager: "We need to make sure everyone understands what work is included and what isn't in our project. Are you working on the document for it?"

Panel 2:

  • Team Member: "Yes, we will be able to share it review soon."

Which document the team should be presenting to the project manager?

  1. Project Charter
  2. Risk Register
  3. Scope Management Plan
  4. Stakeholder Register

Answer: C

Explanation: Scope Management Plan outlines how the project's scope will be defined, validated, and controlled. It is a component of the project management plan and ensures that all stakeholders have a clear understanding of what is included in the project and what is not.  To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests.

Free CAPM Sample Question No. 14:

Question Type: Enhanced Matching (Drag-n-drop)

Match each conflict management technique to its correct description:

1

Collaborating

 

A

Finding a mutually acceptable solution that partially satisfies both parties.

2

Compromising

 

B

Trying to satisfy one's own interests at the expense of the other party

3

Avoiding

 

C

Working together to find a solution that fully satisfies both parties

4

Forcing

 

D

Neglecting the conflict altogether and not helping either party achieve their goals

5

Accommodating

 

E

Giving in to the other party's needs while neglecting one's own

 

  1. 1 – C; 2 – A; 3 – B; 4 – D; 5 – E
  2. 1 – B; 2 – A; 3 – D; 4 – C; 5 – E
  3. 1 – E; 2 – A; 3 – D; 4 – B; 5 – C
  4. 1 – C; 2 – A; 3 – D; 4 – B; 5 – E

Answer: D

Explanation: Collaborating technique involves working together cooperatively to find a solution that fully satisfies the needs and concerns of both parties. It's a win-win approach. Compromising method seeks a middle ground where both parties give up something to reach a mutually acceptable solution. Avoiding technique involves ignoring the conflict and not addressing it. Forcing is an assertive and uncooperative technique where one party pursues their own concerns at the expense of others. It’s a win-lose approach. Accommodating technique involves one party giving in to the other’s wishes while neglecting their own needs. It’s a lose-win approach. As part of our CAPM Training, you get to learn all these concepts in detail. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a Drag-n-drop or Enhanced matching question in which you need to drag the items from right to match them with the items given on left. In CAPM Exam portal, you will be able to drag the items. To explore more such CAPM sample questions, access CAPM Practice Tests. 

Free CAPM Sample Question No. 15:

Question Type: Hot-Spot

Refer to the burn down chart below and answer the following question:


Based on the chart, which of the following statements is true?

  1. The team is ahead of schedule and will likely complete all the story points before the sprint ends.
  2. The team is behind schedule and will likely need to extend the sprint to complete all the story points.
  3. The team is on track to complete all the story points exactly on the last day of the sprint.
  4. The team has completed more story points than planned and has extra capacity.

Answer: A

Explanation: The ideal line (Amber line) represents the planned progress of completing story points. The actual burn down line (Grey line) shows the team's actual progress. Since the actual burn down line is consistently below the ideal line, it indicates that the team is completing story points faster than planned. Therefore, the team is ahead of schedule and is likely to complete all the story points before the sprint ends. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a hot-spot kind of question in which you need to read the graph and answer the question by clicking a particular region on the graph. To get access to many such hot spot/ hot area sample questions of CAPM exam, you may explore the CAPM Practice Tests.

Free CAPM Sample Question No. 16:

Question Type: Hot-Spot

Based on the velocity chart below, identify the sprint where the team had the most significant drop in velocity.


Instructions: Click on the bar that represents the sprint with the most significant drop in velocity.

    1. Sprint 1
    2. Sprint 3
    3. Sprint 2
    4. Sprint 4

Answer: B

Explanation: In the provided velocity chart:

  • Each blue bar represents the story points completed in a sprint.
  • The height of each bar shows the team's velocity for that sprint.

By examining the chart, Sprint 3 shows a noticeable drop in velocity compared to the other sprints. This indicates that the team completed fewer story points during Sprint 3 than in the other sprints, making it the sprint with the most significant drop in velocity. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a hot-spot kind of question in which you need to read the graph and answer the question by clicking a particular region on the graph. To get access to many such hot spot/ hot area sample questions of CAPM exam, you may explore the CAPM Practice Tests.

Free CAPM Sample Question No. 17:

Question Type: Comic Strip

Panel 1:

Project Manager: "We need to finalize the contract for the new project and we want to keep costs predictable and within budget”

Panel 2:

Vendor: "Sure, we can choose one of the contract types accordingly.”

Which contract type do you suggest for this agreement?

  1. Fixed-Price
  2. Cost-Reimbursable
  3. Time & Material
  4. Cost-Plus-Fixed-Fee

Answer: A

Explanation: Fixed-Price type of contract involves a set price agreed upon for the project scope, providing cost certainty for the buyer. Fixed-Price contract is recommended for keeping costs predictable and within budget. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests.

Free CAPM Sample Question No. 18:

Question Type: Enhanced Matching (Drag-n-drop)

Match each estimation method to its correct description:

1

Analogous Estimating

 

a.

Estimation involving breaking down project work into smaller components and estimating each component separately.

2

Parametric Estimating

 

b.

Estimation using three values (optimistic, pessimistic, and most likely) to calculate an average or weighted average estimate.

3

Three-Point Estimating

 

c.

Estimation involving a statistical model to predict costs or duration based on historical data and variables.

4

Bottom-Up Estimating

 

d.

Estimation based on historical data from similar projects.

  1. 1 – d; 2 – c; 3 – a; 4 – b
  2. 1 – d; 2 – c; 3 – b; 4 – a
  3. 1 – d; 2 – a; 3 – b; 4 – c
  4. 1 – a; 2 – c; 3 – b; 4 – d

Answer: B

Explanation: Analogous Estimating also known as top-down estimating, this approach uses historical data from similar projects as a basis for estimating the current project. Parametric Estimating technique uses statistical relationships between historical data and other variables to calculate estimates. Three-Point Estimating method uses three estimates—optimistic, pessimistic, and most likely—to derive an average or weighted estimate, often using techniques like PERT (Program Evaluation and Review Technique). Bottom-Up Estimating method involves breaking down project work into smaller components, estimating the cost or duration for each component, and then aggregating these estimates to get the total project estimate. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a Drag-n-drop or Enhanced matching question in which you need to drag the items from right to match them with the items given on left. In CAPM Exam portal, you will be able to drag the items. To explore more such CAPM sample questions, access CAPM Practice Tests. 

Free CAPM Sample Question No. 19:

Question Type: Comic Strip

Panel 1:

Business Analyst: "We need to finalize the acceptance criteria for the new feature. What do you think we should include?"

Panel 2:

Project Manager: "Let's make sure we cover all the essential aspects. We need include all the conditions that satisfy the stakeholders.”

Based on the conversation, which of the following should NOT be included in the acceptance criteria?

  1. Specific conditions that must be met
  2. Measurement criteria to ensure conditions are met
  3. General project milestones
  4. Acceptance criteria that align with stakeholder expectations

Answer: C

Explanation: In the comic strip, the focus is on defining acceptance criteria, which should include specific conditions, measurement criteria, and alignment with stakeholder expectations. General project milestones, while important for overall project management, are not part of the acceptance criteria for specific features or deliverables. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests.

Free CAPM Sample Question No. 20:

Question Type: Comic Strip

Panel 1:

  • Scrum Master: "Our sprint backlog for this sprint includes several items. Let's review them to ensure we have everything we need."

Panel 2:

  • Developer: "Sure, let’s check the items. What are we looking for?"

Panel 3:

  • Scrum Master: "We need to ensure that each item is well-defined, has clear acceptance criteria, and is estimated for effort."

Panel 4:

  • Developer: "Got it. Here’s the list of backlog items. Let's make sure each one meets these criteria."

Panel 5:

  • Scrum Master: "Excellent! For the backlog item 'User Authentication,' we have clear acceptance criteria, and it's estimated at 8 story points. That looks good."

Panel 6:

  • Developer: "And for 'Database Optimization,' it has vague criteria and no effort estimation. We should address this."

Based on the comic strip, which backlog item needs further attention?

  1. User Authentication
  2. Database Optimization
  3. Both items
  4. Neither item

Answer: B

Explanation: "Database Optimization" requires attention as "Database Optimization" has vague criteria and lacks an effort estimation, indicating that it needs further clarification and estimation. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests.

Free CAPM Sample Question No. 21:

Question Type: Hot-Spot

Refer to the product backlog items in the diagram below and identify the item that is typically the highest priority for the next sprint.

Item A: "Implement user login feature"

Item B: "Refactor codebase"

Item C: "Develop user profile page"

Item D: "Fix critical bug in payment system"

Answer: Item D

Explanation: In Agile practices, items that address critical bugs or high-priority issues (like Item D: Fix critical bug in payment system) are typically given higher priority in the sprint backlog. This is because resolving critical bugs often takes precedence to ensure the product remains functional and stable for users.

Item A and Item C are important features but may not be as urgent as fixing a critical bug. Item B (refactoring) is typically less urgent compared to addressing immediate issues impacting functionality. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a hot-spot kind of question in which you need to read the graph and answer the question by clicking a particular region on the graph. To get access to many such hot spot/ hot area sample questions of CAPM exam, you may explore the CAPM Practice Tests.

Free CAPM Sample Question No. 22:

Question Type: Hot-Spot

Refer to the diagram of the procurement management plan components below. Click on the section that outlines how the vendors will be evaluated and selected.

1

Procurement Process

2

Source Selection Criteria

3

Contract Types

4

Performance Monitoring and Control

5

Change Management Procedures

 

  1. Section 1
  2. Section 2
  3. Section 3
  4. Section 4
  5. Section 5

Answer: 2

Explanation: Procurement Process details how procurement activities are conducted. Source Selection Criteria specifies the standards for choosing vendors and the points to be considered while selecting the vendors. Contract Types outlines the different contract types used in procurement. Performance Monitoring and Control describes how procurement performance will be tracked and controlled to ensure compliance with contractual obligations. Change Management Procedures details how changes to procurement agreements will be handled. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a hot-spot kind of question in which you need to read the graph and answer the question by clicking a particular region on the graph. To get access to many such hot spot/ hot area sample questions of CAPM exam, you may explore the CAPM Practice Tests.

Free CAPM Sample Question No. 23:

Question Type: Hot-Spot

Refer to the diagram of a Risk Register below, click on the section that details the mitigation strategies for identified risks.

Section 1

Risk Description

Section 2

Risk Source

Section 3

Risk Response Planning

Section 4

Risk Anticipated On

Section 5

Risk Owners

 

  1. Section 5
  2. Section 3
  3. Section 4
  4. Section 2
  5. Section 1

Answer: B

Explanation: Risk Response Planning outlines the strategies and actions to mitigate, transfer, accept, or avoid risks. Risk Description involves documenting the risks identified in the project. Risk Source includes the possible source of the risk. Risk Monitoring and Control involves tracking identified risks and implementing response plans. Risk Owners identifies who is responsible for managing each risk. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a hot-spot kind of question in which you need to read the graph and answer the question by clicking a particular region on the graph. To get access to many such hot spot/ hot area sample questions of CAPM exam, you may explore the CAPM Practice Tests.

Free CAPM Sample Question No. 24:

Question Type: Comic-Strip

Panel 1:

  • Scrum Master: "Welcome to the sprint review! We’re excited to show you what we’ve accomplished this sprint."

Panel 2:

  • Developer: "Here’s the new feature we’ve developed: the user dashboard. It includes all the functionalities we discussed."

Panel 3:

  • Customer: "The dashboard looks great, but I noticed that the report generation feature is missing some key metrics we need."

Panel 4:

  • Scrum Master: "Thank you for the feedback. Could you please specify which metrics are missing so we can address them in the next sprint?"

Panel 5:

  • Customer: "Sure, we need the following metrics: user engagement, activity history, and real-time performance data."

Panel 6:

  • Developer: "Got it! We’ll add these metrics to our backlog and prioritize them for the next sprint."

Based on the comic strip, which of the following actions should the team take next?

  1. Complete the sprint review and move on to the next sprint without any changes.
  2. Document the customer’s feedback, update the backlog with the new requirements, and prioritize them for the next sprint.
  3. Ignore the feedback and continue working on existing backlog items
  4. Delay the next sprint until the missing metrics are added to the current feature.

Answer: B

Explanation: A is incorrect because the team should address the customer’s feedback rather than move on without changes. B is correct because documenting feedback, updating the backlog, and prioritizing new requirements is the appropriate action to incorporate the customer’s needs in the next sprint. C is incorrect as ignoring feedback would not address the customer’s needs or improve the product. D is incorrect because delaying the next sprint is not necessary; the feedback can be incorporated into the backlog for future work. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is Comic Strip type of question in which some comic strip contraining conversation between various stakeholders will be provided and you need to read through the conversation and answer the question. For more such comic strip types question, you may explore our CAPM Practice Tests.

Free CAPM Sample Question No. 25:

Question Type: Hot-Spot

Refer to the diagram of the Risk Breakdown Structure (RBS) below. Click on the section that typically includes risks related to issues such as market changes or regulatory issues.

Section 1

Technical Risks

Section 2

Organizational Risks

Section 3

External Risks

Section 4

Project Management Risks

Section 5

Schedule Risks

 

  1. Section 2
  2. Section 5
  3. Section 1
  4. Section 3
  5. Section 4

Answer: D

Explanation: Technical Risks involve risks related to technology, equipment, or technical challenges. Organizational Risks include risks related to organizational processes, structure, and resource allocation. External Risks encompass risks from external factors such as market conditions, regulatory changes, and external stakeholders. Project Management Risks pertain to risks associated with project management practices and methodologies. Schedule Risks involve risks related to project scheduling and deadlines. To get in-depth knowledge about each project management concepts, join our CAPM Certification Training. To learn project management, you opt our CAPM E-learning course which is self-paced yet effective.

This is a hot-spot kind of question in which you need to read the graph and answer the question by clicking a particular region on the graph. To get access to many such hot spot/ hot area sample questions of CAPM exam, you may explore the CAPM Practice Tests.